Description
Development of a multi-activity across the Richemont campus building, delivery scheduled for the 2nd quarter 2019, the work in progress. Hotel - Commercial - Logistics - Offices - Deposits - Workshops. The wing Jura: 5'255 sqm spread over 6 floors (workshops, offices, commercial premises, warehouses) and divisible from 250 m2. The ground plate of 620 m2 with a height under 3m90 ceiling 1st plateau 715 m2 with a height under 3m90 ceiling On the floors trays 980 m2 with a height under 3m50 ceiling Each level offers a permissible floor load of 800 kg / m2 delivery access to the building: - external delivery area on one level and a delivery area in the basement with direct access to the lifts. - 2 lifts 1T. Surface finishing for the Wing Jura: - Floors and ceilings: raw, ready to receive a coating. - Interior walls: dubbing ready finish. - Medical: Health unit included as standard. - Heating: available power, waiting in the sheath (Possible active beam). - Ventilation: available power, waiting in the sheath (Possible active beam). - Refreshments: available power, as evidence of need, waiting in the sheath (Possible active beam). - Electricity: Energy rail available in the duct. Exterior facade of the building: - Opening windows with blinds automated strips. - Roof terrace accessible to users of the building. - Place roof available for tenants technical equipment. Plans available.
Situation
In Meyrin on the outskirts of Geneva, close to the airport and the highway bypass.
Meyrin-Satigny: important logistics and industrial area
The immediate surroundings: watch industry, warehouses, rail link and various commercial activities.
Conveniences
Neighbourhood
- Shops/Stores
- Bank
- Post office
- Restaurant(s)
- Railway station
- Tram stop
- Highway entrance/exit
- Near customs
Outside conveniences
- Terrace/s
- Covered parking space(s)
- Parking
Inside conveniences
- Wheelchair-friendly
- Lift/elevator
- Separated lavatory
Equipment
- Phone
- Cable/TV
- Internet connection
- Electric blind
- Interphone
- Freight elevator
- Waste water connection
Floor
- At your discretion
Condition
- New
Style
- Modern
Standard
- Minergie®
Energy efficiency
The energy label is the result of an evaluation of the global energy performance (energy consumption and energy source) and of the performance of the building envelope.
Distances
Station
10 m
Public transports
10 m
Freeway
300 m
Airport
350 m
Post office
200 m
Bank
200 m